25568ISO 25568 Revision CheckerDraft Technical Specification, first edition Stage 50.00 · 29 Sep 2026

Home / Dated plan

The dated plan

A plan built from the public record, not from a promise. The only date taken from outside this build is the ISO stage record of 29 September 2026. The planning estimate of 17 February 2027 is ours, and it is labelled as an estimate wherever it appears. Everything else is work you can start now.

The estimate: Planning estimate only: 120 days from the build date of 20 October 2026. ISO records stage 50.00 on 29 September 2026. ISO has not announced a publication date.

Twelve steps, the window they fall in and the published clause behind the work.
WindowStepWhat it meansBehind it
NowRead the record and run the checkConfirm the stage, the scope and the planning date with their basis. Record the answer you give the committee.This page and the free check
NowInventory generative AI in useList every generative AI system and embedded copilot, with the business owner and the technical owner.42001 A.4.2, A.4.3
NowTest one live use against the recordTake the use with the highest exposure and run the identification, analysis and treatment steps by hand.23894 6.3 to 6.5
NowCheck the statement of applicabilityConfirm every Annex A control the use depends on is included, or that its exclusion is justified.42001 Annex A
NowName the owners and the switch-off routeOne name for approval, one for the output and one who can stop the system.42001 A.3.2
Before 50.20Diarise the ballot windowThe next stage opens an eight week ballot. The record gains a date when ISO publishes it.ISO stage codes
Before 50.20Complete the impact assessment for the highest exposure useSigned, dated and attached to the deployment decision.42001 A.5.2, A.5.3
Before 50.20Run one adversarial test and keep the failuresPrompt injection in uploaded content, a jailbreak attempt and a data exfiltration attempt through a tool call.42001 A.6.2.4
At 60.00Re-read the record when the text is under publicationThe title and identifiers are fixed. Rebuild the register against the published clause list.ISO stage codes
At 60.60Rebuild the register from the published textReplace the companion reading with the draft read as published, and keep the old rows for the audit trail.This record, changelog
Within 60 days of publicationUpdate the risk criteria and the control mappingAdd the generative AI risk sources and controls the published text names, and record the change.23894 6.3.4, 42001 A.6.1.2
At the next AIMS auditShow the decision logShow what was decided before publication, on what basis, and what changed after it.42001 clause 9.2

Put the plan in the register Check where you stand

Why the plan starts now

The AIMS duties and the EU AI Act duties already apply. Waiting for publication leaves the risk work until the point when an auditor can ask why the method does not reflect the new guidance.

Why the plan does not overclaim

It does not say the draft requires anything, because the clause text is not published. It schedules the work the draft's published scope names, against the standards that already carry it.